Q: What is the minimum period for which the lime concrete in foundation be left wet without the start of masonry work over it?
A.
3 days
B.
5 days
C.
7 days
D.
15 days
Correct Answer:
Option C - Before starting masonry concrete lime 1 : 18 : 36 is laid on the foundation. Approx 7 days curing is done on this foundation and then structure are constructed.
C. Before starting masonry concrete lime 1 : 18 : 36 is laid on the foundation. Approx 7 days curing is done on this foundation and then structure are constructed.
Explanations:
Before starting masonry concrete lime 1 : 18 : 36 is laid on the foundation. Approx 7 days curing is done on this foundation and then structure are constructed.