Q: What is minimum cement content required for RC work which is exposed to aggressive sub-soil or ground water?
  • A. 300 kg/m³
  • B. 320 kg/m³
  • C. 360 kg/m³
  • D. 340 kg/m³
Correct Answer: Option D -