Q: Which of the following multiplying factor is used for the estimation of lead for Cartze tracks?
A.
0.8
B.
1
C.
1.1
D.
1.2
Correct Answer:
Option C - The multiplying factor is used for the estimation of lead for–
(i) Cartze tracks – Lead × 1.1
(ii) Metal tracks – Lead × 1.0
(iii) Sandy tracks – Lead × 1.4
C. The multiplying factor is used for the estimation of lead for–
(i) Cartze tracks – Lead × 1.1
(ii) Metal tracks – Lead × 1.0
(iii) Sandy tracks – Lead × 1.4
Explanations:
The multiplying factor is used for the estimation of lead for–
(i) Cartze tracks – Lead × 1.1
(ii) Metal tracks – Lead × 1.0
(iii) Sandy tracks – Lead × 1.4