Q: When not specified, the volume of steel in R.C.C. work is taken as:
A.
1% to 1.6% of R.C.C. volume
B.
2% to 4% of R.C.C. volume
C.
4% to 6% of R.C.C. volume
D.
0.6% to 1% of R.C.C. volume
Correct Answer:
Option D - When not specified the volume of steel in R.C.C. work taken as 0.6 to 1% of R.C.C. Volume.
Quantity of steel–
Slabs – 0.7 to 1%
Beam – 1% to 2%
Columns – 1% to 5%
D. When not specified the volume of steel in R.C.C. work taken as 0.6 to 1% of R.C.C. Volume.
Quantity of steel–
Slabs – 0.7 to 1%
Beam – 1% to 2%
Columns – 1% to 5%
Explanations:
When not specified the volume of steel in R.C.C. work taken as 0.6 to 1% of R.C.C. Volume.
Quantity of steel–
Slabs – 0.7 to 1%
Beam – 1% to 2%
Columns – 1% to 5%