Q: Using plinth area method, estimate the construction cost of a building having plinth area of 15 m², if the plinth area rate is Rs.2000/- per m².
  • A. ` 30,000
  • B. ` 25,000
  • C. ` 15,000
  • D. ` 20,000
Correct Answer: Option A - Given, Plinth area = 15 m² Plinth area rate = 2000/m² So, cost of building = 15 × 2000 = Rs. 30,000.
A. Given, Plinth area = 15 m² Plinth area rate = 2000/m² So, cost of building = 15 × 2000 = Rs. 30,000.

Explanations:

Given, Plinth area = 15 m² Plinth area rate = 2000/m² So, cost of building = 15 × 2000 = Rs. 30,000.