search
Q: If 6 men and 8 boys can do a piece of work in 10 days, while 26 men and 48 boys can do the same work in 2 days, the time taken by 25 boys in doing the same type of work will be:
  • A. 6 days/6 दिन
  • B. 8 days/8 दिन
  • C. 5 days/5 दिन
  • D. 4 days/4 दिन
Correct Answer: Option B -
answer image

Explanations:

explanation image